Ambitious Construction Company

KATIKEKILE RC DAM

kATIKEKILE RC DAM – MOROTO     Main Components Construction of Water Supply System (Katikekile Roller Compacted Concrete Dam) for the Clinker Factory in Moroto  Roller Compacted Concrete Dam Comprising of Drilling and Grouting, Excavations, Diversion Channels, RCC & GERCC fill, Spillway Construction, River Training, Piping with Fittings, Water Treatment Works, Check Dams and Water […]

Namalu Irrigation Scheme

Namalu Irrigation Scheme Main Components and Physical sizes • Headworks: Dam Embankment, Intake Structure, Spillway Structure, Conduit Structure, Exit Channel & Electro Mechanical Works. • Main, Secondary, Tertiary Canals & Drains: Lined Canal, Canal associated Structures and works, Cross and Head Regulators, Cross and Head Regulators, Crossing Structures & Unlined Drains and Associated structures. • Irrigation […]

Unyama Irrigation Scheme

Unyama Irrigation Scheme Main Components and Physical sizes • Headworks Dam Embankment, Intake Structure, Spillway Structure, Conduit Structure, Exit Channel & Electro Mechanical Works • Main, Secondary, Tertiary Canals & Drains Lined Canal, Canal associated Structures and works, Cross and Head Regulators, Cross and Head Regulators, Crossing Structures & Unlined Drains and Associated structures • Irrigation […]

Wadelai Irrigation Scheme

Wadelai Irrigation Scheme Main Components and Physical sizes Headworks o Completion of dam embankment and protection works o Rehabilitation and reconstruction of the damaged spillway channel Canal System o Repair of damaged sections of the main canals and secondary canals o Repair and completion of tertiary canals o Completion of outstanding works on quadrant canals Infrastructure […]

Sipi Irrigation Scheme Infrastructures & Facilities

Sipi Irrigation Scheme Infrastructures & Facilities Main Components and Physical sizes • Headworks Diversion Weir , Intake Structure, Settling Basin • Main, Secondary, Tertiary Canals & Drains Lined Canal, Canal associated Structures and works, Cross and Head Regulators, Cross and Head Regulators, Crossing Structures & Unlined Drains and Associated structures • Irrigation Infrastructure Facilities Livestock Watering […]

Ongole Dam & Valley Tank – Katakwi

Ongole Dam & Valley Tank – Katakwi Main Components and Physical sizes • Earthen Dam (950m Length, 6.0m High): Zoned earth fill with Clay, Gravel, Sand filters, Stone riprap protections and turfing • Spillway 45.0M length Ogee weir – Spillway with U/s and D/s aprons • Dam Reservoir: 0.8 million Cubic meter dam reservoir • Abstraction […]

Tochi Irrigation Scheme Infrastructure & Facilities – Oyam

Tochi Irrigation Scheme Infrastructure & Facilities – Oyam Main Components and Physical sizes • Earthen dam : Zoned earth fill with Clay, Gravel, Sand filters, Stone riprap protections and turfing. • Spillway: Ogee weir – Spillway with U/s and D/s aprons. • Dam Reservoir • Head Regulators: Two (2) Water intake structures on Dam embankment. • […]

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Building Excellence. Delivering the Future

Main Offices

Monday-Saturday: 8am-5pm

© Copyright 2026 Ambitious Construction .