Project Overview
  • Country: Uganda
  • District: Oyam
  • Sector: Irrigation
  • Client: Ministry of Water and Environment
  • Status: Completed

Tochi Irrigation Scheme Infrastructure & Facilities - Oyam

Main Components and Physical sizes

• Earthen dam :

Zoned earth fill with Clay, Gravel, Sand filters, Stone riprap protections and turfing.

• Spillway:

Ogee weir – Spillway with U/s and D/s aprons.

• Dam Reservoir
• Head Regulators:

Two (2) Water intake structures on Dam embankment.

• Main canals
• Secondary Canals:

Secondary canals and associated structures – lined canal with Cross regulators, Turnouts and Crossing bridges.

• Tertiary and Quadrant Canals:

Tertiary, Quadrant canals and associated structures – Unlined canals with Turn out structures, Drop structures and Outfall structures.

• Drains and associated Structures:

Secondary, Tertiary drains and associated structures – Unlined Drains with Drop structures, Pipe culverts and cross bridges.

• Access and Scheme roads:

Road including culvert crossings and side drains.

• Flood protection dykes:

FPD with blended materials and river dredging at Spillway tail channel and Tochi River.

• Steel/Hydro mechanical gates:

Various size of steel Sluice gates and Concrete gates for Tertiary turnouts.

• Access and Scheme roads:

Roads including culvert crossings and side drains.

• Scheme building and facilities:

Includes Store, Office block, Residence blocks, Sanitation blocks, Guard houses and General civil works.

• 720 ha gross command area
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Building Excellence. Delivering the Future

Main Offices

Monday-Saturday: 8am-5pm

© Copyright 2026 Ambitious Construction .