Caren

Project Overview
  • Country: Uganda
  • District: Kasese
  • Sector: Water
  • Client: Ministry of Water and Environment
  • Status: Completed

River Nyamwamba Flood Mitigation Against Damage - Kasese

Main Components and Physical sizes

Emergency Maintenance of River Nyamwamba for Flood Mitigation Against Damage of Critical Infrastructure and Loss of Livelihoods.

SCOPE OF WORKS:

  • River Nyamwamba – Desilting/Dredging/Excavation and Breaking up Boulders within water channel.
  • Construction of River side bunds/Embankment by filling excavated material and boulders.
  • Protect River embankment by PVC coated gabions.
  • Protect River embankment by Cyclopean concrete at Curves/Critical areas.

PHYSICAL SIZE OF WORKS:

  • Excavation/Dredging and Boulder breaking
  • Construction of River bunds/Embankment 
  • Gabion protections
  • Cyclopean Concrete works 
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Building Excellence. Delivering the Future

Main Offices

Monday-Saturday: 8am-5pm

© Copyright 2026 Ambitious Construction .