Project Overview
  • Country: Uganda
  • District: Kween
  • Sector: Irrigation
  • Client: Ministry of Water and Environment
  • Status: Completed

Ngenge Irrigation Scheme Infrastructure & Facilities - Kween

Main Components and Physical sizes

• Head works:

Two RCC C-35 Head works (Weirs, Intakes, Settling basins, crossing bridges, Protections etc.) on two rivers.

• Main Canals

Main canals (Lined with C-25 concrete).

• Water Storage Reservoirs:

Two Night storage reservoirs with Clay and Gravel filled embankment.

• Secondary Canals:

Secondary canals and associated lined canal with Cross regulators, Drop structures and Crossing bridges.

• Tertiary Canals:

Tertiary canals and associated structures – Unlined canals with Turn out structures, Drop structures and Outfall structures.

• Associated Structures:

Secondary, Tertiary drains and associated structures – Unlined Drains with Drop structures, Pipe culverts and cross bridges.

• Steel/Hydro mechanical gates:

Various size of steel Sluice gates and Concrete gates for Tertiary turnouts.

• Flood protection dykes:

FPD with blended materials and river dredging.

• Access and Scheme roads:

Roads including culvert crossings and side drains.

• Scheme building and facilities:

Includes Store, Office block, Residence blocks, Sanitation blocks, Guard houses and General civil works.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Building Excellence. Delivering the Future

Main Offices

Monday-Saturday: 8am-5pm

© Copyright 2026 Ambitious Construction .