Ngenge Irrigation Scheme Infrastructure & Facilities - Kween

Country

Uganda

District

Kween

Sector

Irrigation

Client

Ministry of Water and Environment

Status

Completed


Main Components and Physical sizes

•Head works:

Two RCC C-35 Head works (Weirs, Intakes, Settling basins, crossing bridges, Protections etc.) on two rivers.

Main canals (Lined with C-25 concrete) – 2.50 KMS.

Two Night storage reservoirs – each of min. 285,000m3 Capacity with Clay and Gravel filled embankment

Secondary canals and associated structures – 13.25KMS lined canal with Cross regulators, Drop structures and Crossing bridges.

Tertiary canals and associated structures – 38.00KMS Unlined canals with Turn out structures, Drop structures and Outfall structures.

Secondary, Tertiary drains and associated structures – 63.00KMS of Unlined Drains with Drop structures, Pipe culverts and cross bridges.

Various size of steel Sluice gates and Concrete gates for Tertiary turnouts.

9.25KMS of FPD with blended materials and river dredging.

42.10KMS of roads including culvert crossings and side drains.

Includes Store, Office block, Residence blocks, Sanitation blocks, Guard houses and General civil works.